References SmartTECS Engineers (excerpt)
Find out more about the work of the experts at SmartTECS Engineers GmbH here.

Trams / Metros

Overall railway technology
Single reference
Find out more about the work of the experts at SmartTECS Engineers GmbH here.
Project
- Overall vehicle development for a tramway infrastructure Turn-Key-Project in Asia
- Customer: Taiwanese manufacturer
- Complexity: Functional development of the tram from concept to approved series production vehicle.
- Project duration: 4 years
- Complexity: about 15 development and test engineers
Requirements
- Complete development process (V Model) for functional development
- Concept, system engineering, wiring diagram, TCMS, test and validation, prototype implementation
- Beginning with a concept development
- Project completion after commissioning of the prototype tram, testing, validation, and approval
- Training of customer personnel
Implementation
- Concept development from scratch
- Functional development for overall vehicle (system engineering)
- Challenge: Catenary-free driving in crossing areas via Li-Ion battery system
- Vehicle software development (TCMS, according to DIN EN 50128)
- Development of electrical schematics and wiring documentation
- Test process implementation
- Commissioning in Asia, test runs, validation runs, and climate chamber tests
Additional customer value
- Up to 15 streetcars of a customized low-floor streetcar produced by the Taiwanese customer
- Training for customer engineers
- The customer was given the opportunity to take over the requirements management processes
- Development according to German standards, approval based on German regulations
- Creation of training documents for the engineering processes for the customer
Employee References (excerpt)
Find out more about the work of the experts at SmartTECS Engineers GmbH here.

Trams / Metros

Overall railway technology
