References SmartTECS Rail Service (SmartTECS Group, AAIT) (excerpt)

Gain an impression of the rail vehicle modernization work carried out by SmartTECS Rail Service GmbH.

Project reference: ETCS retrofitting of old vehicles

Gain an impression of the rail vehicle modernization work carried out by SmartTECS Rail Service GmbH.

Project

  • Retrofitting a locomotive with an ETCS system.
  • Client: Energy supply company based in Germany.
  • Order volume: Integration and installation of the ETCS system on several vehicles.
  • Focus: Integration without support from the vehicle manufacturer.
  • Project duration: 2 years + warranty management

Requirements

  • Integration without support from the vehicle manufacturer.
  • Processing and recovery of the commissioning authorization.
  • Preparation of evidence for DeBo, NoBo and AsBo as well as project coordination of the assessment bodies.
  • Compliance with the tight time frame set by the funding body.

Implementation

  • Achieving vehicle competence through testing and evaluation.
  • Concept development based on vehicle knowledge and the system requirements of the ETCS supplier.
  • Installation planning and construction supervision for a railroad workshop.
  • Conversion testing, technical documentation and approval processing.
  • Safety Manager, preparation of safety documentation and handling of the safety assessment body.

Added customer value

  • Complete project implementation from a single source.
  • Interface between ETCS supplier, workshop, assessment bodies and safety authority.
  • Preparation of documentation such as EC declarations for the change management body (RU).

Project reference: Safety control system for light rail vehicle

Gain an impression of the rail vehicle modernization work carried out by SmartTECS Rail Service GmbH.

Project

  • Retrofitting a safety control system on a light rail vehicle to achieve the new approval after modernization
  • Client: Supplier of traction converters
  • Scope: Modernization of 10 low-flood streetcars
  • Project duration: 2 years

Requirements

  • Existing car control units including drive technology were replaced with non-safety-related technology as part of a refit.
  • The safety functions of the existing system had to be replicated or other suitable measures had to be taken to maintain the overall safety level.
  • The commissioning permit in accordance with BOStrab had to be processed and obtained again.

Implementation

  • Concept development of a safety control system that implements the safety functions according to VDV 161 and monitors/prevents further hazards due to the new technology.
  • System and software development according to SIL 3 with assessment.
  • Safety management, risk evaluation, development of safety measures, safety verification with external assessment.
  • Development of regression test specifications for future software changes to the non-safety-related control system.

Added customer value

  • Development processes could be simplified and designed according to basic integrity.
  • Future software changes can be handled just as easily.
  • External outsourcing to nativ Speaker of security management and approval processing.
  • Use of tried and tested SIL 3 technology from previous projects.