References SmartTECS Rail Service (SmartTECS Group, AAIT) (excerpt)
Gain an impression of the rail vehicle modernization work carried out by SmartTECS Rail Service GmbH.
Project reference: ETCS retrofitting of old vehicles
Gain an impression of the rail vehicle modernization work carried out by SmartTECS Rail Service GmbH.
Project
- Retrofitting a locomotive with an ETCS system.
- Client: Energy supply company based in Germany.
- Order volume: Integration and installation of the ETCS system on several vehicles.
- Focus: Integration without support from the vehicle manufacturer.
- Project duration: 2 years + warranty management
Requirements
- Integration without support from the vehicle manufacturer.
- Processing and recovery of the commissioning authorization.
- Preparation of evidence for DeBo, NoBo and AsBo as well as project coordination of the assessment bodies.
- Compliance with the tight time frame set by the funding body.
Implementation
- Achieving vehicle competence through testing and evaluation.
- Concept development based on vehicle knowledge and the system requirements of the ETCS supplier.
- Installation planning and construction supervision for a railroad workshop.
- Conversion testing, technical documentation and approval processing.
- Safety Manager, preparation of safety documentation and handling of the safety assessment body.
Added customer value
- Complete project implementation from a single source.
- Interface between ETCS supplier, workshop, assessment bodies and safety authority.
- Preparation of documentation such as EC declarations for the change management body (RU).
Project reference: Safety control system for light rail vehicle
Gain an impression of the rail vehicle modernization work carried out by SmartTECS Rail Service GmbH.
Project
- Retrofitting a safety control system on a light rail vehicle to achieve the new approval after modernization
- Client: Supplier of traction converters
- Scope: Modernization of 10 low-flood streetcars
- Project duration: 2 years
Requirements
- Existing car control units including drive technology were replaced with non-safety-related technology as part of a refit.
- The safety functions of the existing system had to be replicated or other suitable measures had to be taken to maintain the overall safety level.
- The commissioning permit in accordance with BOStrab had to be processed and obtained again.
Implementation
- Concept development of a safety control system that implements the safety functions according to VDV 161 and monitors/prevents further hazards due to the new technology.
- System and software development according to SIL 3 with assessment.
- Safety management, risk evaluation, development of safety measures, safety verification with external assessment.
- Development of regression test specifications for future software changes to the non-safety-related control system.
Added customer value
- Development processes could be simplified and designed according to basic integrity.
- Future software changes can be handled just as easily.
- External outsourcing to nativ Speaker of security management and approval processing.
- Use of tried and tested SIL 3 technology from previous projects.